Plans

It all begins with an idea. Maybe you want to a space for family. Maybe you want to turn your backyard into additional income generator. Whatever it is, our ADU can fit.

construction-icon.png

Model IV 410 s.f. ADU

Our Model IV 410 s.f. ADU plan is designed through a streamlined, client focused process. From concept and design to permitting and construction, we ensure every step is efficient, transparent, and tailored to your property’s needs, delivering a functional, modern, and cost-effective living space.

About this Process

Our Model IV 410 sq. ft. ADU design process focuses on simplicity, precision, and functionality. From initial concept to final construction, we guide you through every stage, including site evaluation, design customization, permitting, and building. Each step is streamlined to ensure your Accessory Dwelling Unit (ADU) meets local codes, maximizes space efficiency, and enhances your property’s long-term value.

A picture of Eligwe-Construction-Floor-plan

Call For a Quote:

(561) 433 6778

Model IV 410 s.f. ADU

Eligwe Details Plan Picture

Details

The level of details we like to attain explain all components used in the home construction. We focus on designing with materials that have already been approved by the State.

A picture of Eligwe-Construction-Floor-plan

Floor plan

It all begins with an idea. Maybe you want a space for family, or maybe an additional income generator. Whatever it is, our ADU can fit.

A Picture of Eligwe-Construction-Elevation-Plan

Elevation

Offering different styles for compatibility with existing home designs. We have experienced specific treatments required by certain cities to mantain character.

F.A.Q.

Find quick answers to common questions about our ADU design, renovation, and construction services. We’ve compiled helpful information to guide you through timelines, costs, permits, and the overall building process making your experience smooth and stress free.

What are the key zoning and land use considerations for single-family developments in Florida?

Zoning and land use vary by municipality, common factors include lot size minimums, density limits, setbacks, maximum height, and stormwater management. We help with navigating these regulations to ensure your project complies from the start.

Can I legally build an ADU on my property?

It depends on your local zoning regulations: Your property’s zoning designation (single-family, multifamily), Lot size and coverage limitations, Setback and height requirements and Municipal or county rules. You will need to apply for permits and submit plans that meet Florida Building Code. We can help with entire process.

What construction documents do I need to apply for a residential building permit in Florida

You’ll typically need a full set of construction plans, including architectural drawings, site plans, structural engineering, energy calculations, mechanical, electrical, and plumbing (MEP) layouts. We prepare and coordinate all required documents to meet local building code and permitting standards.

How long does it take to prepare construction documents for permit submission?

Depending on the project’s size and complexity, preparing permit-ready construction documents can take 2 to 8 weeks. This includes time for design development, engineering coordination, and final plan reviews before submission.

How much does a home renovation cost?

Renovation costs vary widely based on the scope of work, materials chosen, and structural requirements. We provide detailed estimates and work within your budget to maximize value.

Are you licensed and insured in Florida?

Yes. We are fully licensed and insured in the state of Florida. We carry all the necessary insurance protect our clients, team, and your property throughout the construction process.

Do my construction plans need to be signed and sealed by a licensed architect or engineer in Florida?

Yes. For structural work or new residential construction, Florida law requires that plans be signed and sealed by a licensed architect or engineer. We work with licensed professionals to ensure your documents meet this requirement for a smooth permitting process.

What is the first step in starting a construction development project in Florida?

The first step is conducting a site assessment and feasibility study to evaluate zoning, land use, permitting requirements, and overall project potential. We then help develop a clear plan, budget, and timeline to guide the project from concept to construction.

What areas of Florida does your company serve?

We proudly serve residential clients throughout Florida. If you’re unsure whether we work in your location, just contact us, we are happy to discuss your project.

Can you help with the design, or do I need to hire an architect separately?

Yes, we handle everything from design to construction, so you don’t need to hire separate companies. This makes the process faster, more affordable, and keeps your vision on track from start to finish

How long does it take to build a custom home in Florida?

The timeline for building a custom home typically ranges from 6 to 12 months, depending on the size, complexity, and permitting process in your area. Weather, material availability, and design changes can also impact the schedule. We work closely with you to set realistic timelines and keep the project on track.

Do I need permits for a home renovation or addition?

Yes. In Florida, most renovations including structural changes, additions, electrical, plumbing, and roofing require permits. Our team handles the permitting process for you, ensuring all work complies with local building codes and Florida state regulations.

Contact Us


1200 N Federal Hwy Suite 300 Boca Raton, FL 33432

(561) 433 6778

kevin@eligweconstruction.com